Maximization prepares proper production layout for shoe and leathergoods factory as per machinery list. They tries to make best use of space given from customer’s civil drawing.
Generally the layout is done at CAD as per machinery list. Time motion study is done before layout designing. The layout is done in most scientific way to achieve maximum production output.
Multi layer and multi-storied production layout is done as per customer’s building design.